It's not that loads has changed - the days since we had the solar panels installed have been predominantly grey - well, this is an English winter, after all. However, the system is responding differently already. Even on the greyest day, the panels seem to be generating power from around 9.30 to around 3.30, and we rarely seem to have the "zero output" days that we had for the first few weeks.
There hasn't been a huge change in the sun. In the first month after the winter solstice, the noon position of the sun only gets three degrees higher in the sky, and the day gets less than an hour longer. However, it is evidently enough to take it closer to the light threshold at which the panels start to generate.
We have discovered that the panels weren't optimally connected to the inverter (the south and the west facing panels should have been connected as separate "strings" into the inverter, and they were in fact all linked in series), so Rayotec are coming back to rewire a section of the system. I'm hoping that they are going to find out how much it would cost to install the PC interface module at the same time. I don't know whether this will have a noticeable effect on the performance of the system. In theory, the output of the two different sections of panels can be optimised separately by the inverter: I don't know whether this is likely to give a 1% or a 10% improvement.
The peak output of the system so far has been just over 1000 W - it has reached that on four days, the first after the solstice being 9th January - and the highest total output we've seen has been about 2 KWh. The total output of the system since installation is a mere 13 units, though we lost a couple of days which ought to have been good as a result of our messing around with the system.
Data is not information. Information is not knowledge. Knowledge is not wisdom. Wisdom is not truth. Truth is not life.
Showing posts with label Rayotec. Show all posts
Showing posts with label Rayotec. Show all posts
Wednesday, January 26, 2011
Monday, December 20, 2010
More PV information
The scaffolding to put the solar panels up hadn't been removed yet, and hadn't quite been properly blocked. So I climbed up to the roof this morning and had a go at sweeping the five inches of snow away that was sitting on the panels, and stopping them from working. In combination with a slight thaw (2 degrees during the day) and doubtless the dark colour of the photocollector helping to warm the surface up, a lot of the snow and ice on the panels was removed. As a consequence, in some weak winter sunshine, we reached a peak power output of 134 W, and managed to harvest about 112 Wh - still hardly impressive, but a step up from the zero that had been generated in the last few days.
Some more technical details about the installation. It uses 10 x 230Wp Schott panels - it is thus a 2.3 kWp (kilowatt peak) system - and a StecaGrid 2010+ inverter. The efficiency of the inverter is pretty high - even at a 5% load, it is nearly 80% efficient; its published efficiency is given as 93.3%, which is the efficiency it achieves at 30% of its nominal power, 2000W.
Rayotec give a written quotation of the expected performance of the system. They estimate (based on a mathematical model) that the irradiation of the PV array over the course of a year will be about 16,400 kWh, and the amount of power generated will be around 10% of this, 1,683 kWh. This equates to about 729 kWh/kWp.
Some more technical details about the installation. It uses 10 x 230Wp Schott panels - it is thus a 2.3 kWp (kilowatt peak) system - and a StecaGrid 2010+ inverter. The efficiency of the inverter is pretty high - even at a 5% load, it is nearly 80% efficient; its published efficiency is given as 93.3%, which is the efficiency it achieves at 30% of its nominal power, 2000W.
Rayotec give a written quotation of the expected performance of the system. They estimate (based on a mathematical model) that the irradiation of the PV array over the course of a year will be about 16,400 kWh, and the amount of power generated will be around 10% of this, 1,683 kWh. This equates to about 729 kWh/kWp.
Tuesday, December 14, 2010
Solar panel installation - photos
Under the stairs - big red isolation switch, and meter. Since we now have two sources of power, both the mains electricity and the inverter need to be switched off prior to any work being carried out. The solar supply feeds a line into the consumer unit, as far as I can tell. Incidentally, in the event of a power cut, or loss of AC for other reason (such as the main RCD tripping), the inverter is switched off, and waits for three minutes after power is restored prior to being re-energised.
The inverter, in the roof space. I may regret having it installed up there. The inverter generates and stores lots of data. Even in the fading light, there was something quite fascinating about watching the changing power output of the system. But I'd rather not sit in the loft and do that ....
Monday, December 13, 2010
Solar panel installation
... this started happening today.
The scaffolding team arrived last Tuesday. They had rung on Monday to say that they couldn't make it in on that day, but would come on the Tuesday. This was something of a surprise, since I was pretty sure they weren't due to be there till Wednesday. However, since they were happy to install it without our actual presence, it didn't matter that much.
They rang again on Tuesday morning, to confirm they would be there at 11ish. We were both out at work by then. By the time we got home, the scaffolding was all in place.
Despite potential disruption due to weather, the roof installation team arrived at 9am this morning. The electrician rang at 9.30, to say he'd be there a little later - which he duly was. The installation has proceeded smoothly so far, the only slight complication being that the panels on one section of the roof don't fit in a tidy array, so three will be lined up "portrait" and two running along the bottom of the roof section "landscape". The panels aren't up yet, but the metal framework that will support them is.
As far as cabling is concerned, the inverter will be in the loft, mounted on a board next to the chimney breast. A cable runs from there close to the boiler and then down to the consumer unit area, using cable ties to fix it to the pipe that takes gas up to the boiler. A meter has been mounted, along with a meaty isolation switch - there will be photos soon!
The installation team have been pleased with how smoothly it has gone, and hope to have finished early - they are implying lunchtime, rather than school pickup time.
The scaffolding team arrived last Tuesday. They had rung on Monday to say that they couldn't make it in on that day, but would come on the Tuesday. This was something of a surprise, since I was pretty sure they weren't due to be there till Wednesday. However, since they were happy to install it without our actual presence, it didn't matter that much.
They rang again on Tuesday morning, to confirm they would be there at 11ish. We were both out at work by then. By the time we got home, the scaffolding was all in place.
Despite potential disruption due to weather, the roof installation team arrived at 9am this morning. The electrician rang at 9.30, to say he'd be there a little later - which he duly was. The installation has proceeded smoothly so far, the only slight complication being that the panels on one section of the roof don't fit in a tidy array, so three will be lined up "portrait" and two running along the bottom of the roof section "landscape". The panels aren't up yet, but the metal framework that will support them is.
As far as cabling is concerned, the inverter will be in the loft, mounted on a board next to the chimney breast. A cable runs from there close to the boiler and then down to the consumer unit area, using cable ties to fix it to the pipe that takes gas up to the boiler. A meter has been mounted, along with a meaty isolation switch - there will be photos soon!
The installation team have been pleased with how smoothly it has gone, and hope to have finished early - they are implying lunchtime, rather than school pickup time.